Production process of cosmetic tube

Production process of cosmetic tube: pipe drawing-head injection-printing-tail sealing. This is the basic process of tube production. However, there are differences in specifications and specific production processes. Here are two common production processes of cosmetic tubes. After that, you can also learn about the tube production equipment and then the production process.

Production process of round tube cosmetic tube products:

1.1 pipe drawing-according to the customer’s requirements, draw out the tube body with corresponding pipe diameter and length.
1.2 Note the shoulder-Note the corresponding shoulder according to the customer’s cover allocation.
1.3.1 Offset printing-1-6 color screen printing, according to customer requirements, determine the bright and frosted effects.
1.3.2 screen printing, bronzing and labeling-according to the requirements of customers’ design draft, complete the processes of screen printing, bronzing and labeling.
1.4 Lock cover or tail seal: according to customer requirements, lock cover or tail seal.
1.5 inspection-inspection of product quality. Ensure 100% factory quality.
1.6 packaging-according to the customer’s packaging requirements, package and leave the factory.

Production process of oval cosmetic tube:

2.1 pipe drawing-according to the customer’s requirements, draw out the tube body with corresponding pipe diameter and length.
2.2.1 Shoulder-less offset printing-1-6 color screen printing, according to customer requirements, determine the bright and frosted effects.
2.2.2 Shoulder-less screen printing, bronzing and labeling-according to the requirements of customers’ design draft, complete the procedures of screen printing, bronzing and labeling.
2.3 Note the shoulder-Note the corresponding shoulder according to the customer’s cover allocation.
2.4 Lock cover or tail seal: according to customer requirements, lock cover or tail seal.
2.5 after inspection-inspection of product quality. Ensure 100% factory quality.
2.6 packaging-according to the customer’s packaging requirements, package and leave the factory.


Post time: May-14-2021